Study on study: Difference between revisions
From MultiCharts
No edit summary |
No edit summary |
||
Line 30: | Line 30: | ||
[[Category:Studies]] | [[Category:Studies|G]] |
Latest revision as of 17:42, 17 September 2024
It is possible to use the values of other indicators as inputs for indicator or signal.
To select an indicator value as an input:
- Apply the indicator to the chart.
- In Format Study → Inputs tab click the input value.
- Click the ... button to select the indicator to be used as an input value.
- Select the required indicator and click OK.
- Select the plot value to be used as an input value.
- Click OK.
The line in the input field is Indicator: "Name of indicator" plotN | Input_Name = Input_Value
where:
- Indicator - keyword. It is an obligatory parameter.
- Name of indicator - string value (in quotes) representing. It is an obligatory parameter.
- plotN - plot number is to be used for calculations. Example - plot1, plot2 etc. It is an optional parameter. If not specified, the plot with the smaller number is used.
- | - delimiter.
- Input_name - Input_Value - setting certain value for a certain input. It is an optional parameter.
In MultiCharts .NET this functionality is not available through study inputs. One can access objects of one study from another one via the code: