Backtesting a Portfolio: Difference between revisions
From MultiCharts
(vNbwREJZzLwRTvaUTtD) |
m (Reverted edits by 176.8.90.7 (talk) to last revision by Admin) |
||
Line 1: | Line 1: | ||
http://www. | <br> | ||
Once a portfolio has been created, strategy configured, and portfolio settings selected, the portfolio can be backtested. | |||
<br>To backtest a portfolio: | |||
* Click the '''BackTest''' http://www.multicharts.com/img/wiki/toolbar/portfolio/05_Backtest.gif button on the toolbar, or | |||
* Select '''Portfolio''' in the main menu and then select '''Run Backtesting'''. | |||
<br>Backtesting a portfolio will generate a [[<span style="color: red;">'''LINK'''</span> /0297_Portfolio/22-9705_PortfolioPerfRep.html name=""; |Portfolio Performance Report]] that will be displayed in a separate window. | |||
The description for each performance measure is [[<span style="color: red;">'''LINK'''</span> /0297_Portfolio/22-8004_BTReport.html name="2"; |described in the report]]. | |||
<br> | |||
[[Category:Portfolio Backtesting]] |