It is possible to use the values of other indicators as inputs for indicator or signal.
To select an indicator value as an input:
- Apply the indicator to the chart.
- In Format Study → Inputs tab click the input value.
- Click the ... button to select the indicator to be used as an input value.
- Select the required indicator and click OK.
- Select the plot value to be used as an input value.
- Click OK.
The line in the input field is
Indicator: "Name of indicator" plotN | Input_Name = Input_Value
where:
- Indicator - keyword. It is an obligatory value.
- Name of indicator - string value (in quotes) representing. It is an obligatory value.
- plotN - plot number is to be used for calculations. Example - plot1, plot2 etc. Is optional parameter. If not specified, the plot with the smaller number is used.
- | - delimiter.
- Input_name = Input_Value - setting certain value for a certain input. Is optional parameter.
In MultiCharts .NET this functionality is not available through study inputs. One can access objects of one study from the another one in the code:C# example; VB.NET example